The project was made for the management of Norwegian roads and highways. First, it was carried out at the Egersund shipyard where individual sections were made (each approximately 100 meters long). Then it was transported to the Åstfjord for connection at a height of 44 meters, connecting two fjords with a 700 meter long bridge.