Ventor was responsible for delivery HVAC system for new Green fluid boiler in Połaniec. We were designer of HVAC systems. Ventor prepared works connected with ventilation, smoke removal and cooling systems. All ventilation ducts and fittings were prepared on our worksop in Starszęcin.
Additional we were resposnible for removal and asembling insulation and cladding in the existing part of Plant. Cladding was also prepared on our workshop in Straszęcin